Elite Family Residence 1. Finishing works. — Painting, the 1st, 3rd, 5th floors. — Tiling in the bathrooms, the 5th floor. 2. Waterproofing. — On the balconies. 3. Installation of railings on the staircases. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 1st, 3rd, 5th floors.
— Tiling in the bathrooms, the 5th floor.

2. Waterproofing.
— On the balconies.

3. Installation of railings on the staircases.