Wyndham Grand Batumi Gonio. Riviera. 1. Block B, C. Facade works. Plastering of the facade. 2. Block A. Facade works. Priming of facade. 3. Block B, C. Installation of double-glazed windows. Glass installation. 4. Infrastructure building. Installation of storm water drainage system. Closing of storm sewer ducts. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Block B, C. Facade works.
Plastering of the facade.

2. Block A. Facade works.
Priming of facade.

3. Block B, C. Installation of double-glazed windows.
Glass installation.

4. Infrastructure building. Installation of storm water drainage system.
Closing of storm sewer ducts.