Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. Installation of electrical cables and valves, 7th floor. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Masonry work, 10th floor. Laying ceramic blocks. 4. Installation of plasterboard frame. Covering the perimeter of ceilings, installation of ceiling frame. 5. Infrastructure building. Dismantling of formwork for vertical structures, 3rd floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
Installation of electrical cables and valves, 7th floor.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Masonry work, 10th floor.
Laying ceramic blocks.

4. Installation of plasterboard frame.
Covering the perimeter of ceilings, installation of ceiling frame.

5. Infrastructure building.