Elite Family Residence 1. Finishing works. — Painting, the 4th floor and common areas. — Puttying of walls, preparation for painting, the 5th floor. 2. Facade works. — Cladding the facade. 3. Wiring. Mounting of luminaires. 4. Installation of drywall framing. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 4th floor and common areas.
— Puttying of walls, preparation for painting, the 5th floor.

2. Facade works.
— Cladding the facade.

3. Wiring.
Mounting of luminaires.

4. Installation of drywall framing.