Elite Family Residence 1. Finishing works. — Painting, the 1st, 3rd, 5th floors. — Laying of porcelain stoneware on elevator portals. — Installation of marble window sills. — Laying marble on staircases. — Installation of moldings. 2. Facade works. — Facade cladding with natural stone. 3. Installation of drywall framing. 4. Floor screeding. On the terraces, the 5th floor. 5. Installation of railings on the staircases. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 1st, 3rd, 5th floors.
— Laying of porcelain stoneware on elevator portals.
— Installation of marble window sills.
— Laying marble on staircases.
— Installation of moldings.

2. Facade works.
— Facade cladding with natural stone.

3. Installation of drywall framing.

4. Floor screeding.
On the terraces, the 5th floor.

5. Installation of railings on the staircases.