24.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera Ceramic block walls are being laid on the 2nd floor of block A. In block B, the reinforcement of vertical structures is being carried out. In block C the ground works are in progress. Installation of the floor slab formwork is taking place at the infrastructure building. - European Village

24.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera Ceramic block walls are being laid on the 2nd floor of block A. In block B, the reinforcement of vertical structures is being carried out. In block C the ground works are in progress. Installation of the floor slab formwork is taking place at the infrastructure building.