24.05.2024 Wyndham Grand Residences Batumi Gonio. Family Club In block A on the 1st floor, the walls are being laid with ceramic block. In block B, concreting of vertical structures has taken place. - European Village

24.05.2024 Wyndham Grand Residences Batumi Gonio. Family Club In block A on the 1st floor, the walls are being laid with ceramic block. In block B, concreting of vertical structures has taken place.