02.07.2024 Elite Family Residence Cold and hot water supply and heating systems are being installed. There are facade and roofing works, laying of walls with ceramic block on the 1st floor, backfilling of the backyard. - European Village

02.07.2024 Elite Family Residence Cold and hot water supply and heating systems are being installed. There are facade and roofing works, laying of walls with ceramic block on the 1st floor, backfilling of the backyard.