10.06.2024 Wyndham Grand Residences Batumi Gonio. Riviera In block A on the 2nd floor the walls are being laid with ceramic block. In Block B, the floor slab formwork is being assembled. In block C, concreting of the retaining wall took place. In the infrastructure building, the floor slab is being concreted. - European Village

10.06.2024 Wyndham Grand Residences Batumi Gonio. Riviera In block A on the 2nd floor the walls are being laid with ceramic block. In Block B, the floor slab formwork is being assembled. In block C, concreting of the retaining wall took place. In the infrastructure building, the floor slab is being concreted.