Wyndham Grand Batumi Gonio. Riviera. 1. Block A. Plastering work. Plastering columns in the basement. 2. Blocks A and C. Construction of rear courtyards for townhouses. 3. Block A. Facade work. Plastering the facade. 4. Block E. Installation of engineering systems. — Electrical installation work, marking, fastening clips, cable routing. — Installation of a drainage system. 5. Infrastructure building. Waterproofing work. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering work.
Plastering columns in the basement.

2. Blocks A and C. Construction of rear courtyards for townhouses.

3. Block A. Facade work.
Plastering the facade.

4. Block E. Installation of engineering systems.
— Electrical installation work, marking, fastening clips, cable routing.
— Installation of a drainage system.

5. Infrastructure building.
Waterproofing work.