Wyndham Grand Batumi Gonio. Riviera. 1. Block A. Installation of engineering systems. — Installation of ventilation system. — Plumbing works. 2. Block A. Plastering works. Plastering of columns in the basement. 3. Arrangement of storm water drainage. Fabrication and lining of storm water drainage boxes. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
— Installation of ventilation system.
— Plumbing works.

2. Block A. Plastering works.
Plastering of columns in the basement.

3. Arrangement of storm water drainage.
Fabrication and lining of storm water drainage boxes.