Wyndham Grand Batumi Gonio. Riviera. 1. Block A. Installation of engineering systems. Installation of air-conditioning system. 2. Block A. Plastering works. Plastering of columns in the basement. 3. Arrangement of storm water drainage. Fabrication and sealing of storm sewer ducts. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
Installation of air-conditioning system.

2. Block A. Plastering works.
Plastering of columns in the basement.

3. Arrangement of storm water drainage.
Fabrication and sealing of storm sewer ducts.