Elite Family Residence 1. finishing works. — Facing marble staircases. — Facing travertine on the balconies. 2. Facade works. — Puttying the joints of decorative figures. — Painting of terraces and decorative elements. 3. Installation of interior doors. 4. Electrical installation works. Installation of finishing electrics in the units. 5. Installation of plasterboard frame. Works on the -1 floor in common areas. - European Village

Elite Family Residence

1. finishing works.
— Facing marble staircases.
— Facing travertine on the balconies.

2. Facade works.
— Puttying the joints of decorative figures.
— Painting of terraces and decorative elements.

3. Installation of interior doors.

4. Electrical installation works.
Installation of finishing electrics in the units.

5. Installation of plasterboard frame.
Works on the -1 floor in common areas.