Elite Family Residence 1. Finishing works. — Painting, the 3rd, 5th floors. — Laying of porcelain stoneware on elevator portals. 2. Facade works. — Facade cladding with natural stone. 3. Installation of the staircase railings. 4. Wiring. - European Village

Elite Family Residence

1. Finishing works.
— Painting, the 3rd, 5th floors.
— Laying of porcelain stoneware on elevator portals.

2. Facade works.
— Facade cladding with natural stone.

3. Installation of the staircase railings.

4. Wiring.