Elite Family Residence 1. Finishing works. — Painting. — Puttying of walls, preparation for painting, the 4th, 5th floors. 2. Facade works. — Cladding the facade with natural stone. 3. Installation of railings for staircases. 4. Plumbing. - European Village

Elite Family Residence

1. Finishing works.
— Painting.
— Puttying of walls, preparation for painting, the 4th, 5th floors.

2. Facade works.
— Cladding the facade with natural stone.

3. Installation of railings for staircases.

4. Plumbing.