Wyndham Grand Batumi Gonio. Aqua 1. Facade works. — Facade winterization, the 5th, 7th, 11th floors. — Plastering of facade walls, the 2nd — 20th floors. 2. Installation of utilities systems. — Installation of the exhaust ventilation, the 4th -6th floors. 3. Fabrication and installation of steel arches Balconies on the 19th — 20th floors. 4. Suspended ceiling installation. On the balconies, the 3rd — 4th floors. 5. Waterproofing Balconies of the 20th floor. 6. Drywall frame installation. On the 19th- 20th floors. 7. Floor screeding. On the balconies, the 19th floor. 8. Installation of the elevator. Fabrication of elevator shaft reinforcement frame. 9. Mockup construction on the 13th floors. — Finishing works. — Installation of railings on the central facade. 10. Diamond core drilling for engineering openings, the4th 6th, 10th -11th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 11. Infrastructure building. Ongoing excavating. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Facade works.
— Facade winterization, the 5th, 7th, 11th floors.
— Plastering of facade walls, the 2nd — 20th floors.

2. Installation of utilities systems.
— Installation of the exhaust ventilation, the 4th -6th floors.

3. Fabrication and installation of steel arches
Balconies on the 19th — 20th floors.

4. Suspended ceiling installation.
On the balconies, the 3rd — 4th floors.

5. Waterproofing
Balconies of the 20th floor.

6. Drywall frame installation.
On the 19th- 20th floors.

7. Floor screeding.
On the balconies, the 19th floor.

8. Installation of the elevator.
Fabrication of elevator shaft reinforcement frame.

9. Mockup construction on the 13th floors.
— Finishing works.
— Installation of railings on the central facade.

10. Diamond core drilling for engineering openings, the4th 6th, 10th -11th floors.
Marking and drilling of precise openings for the installation of utilities in the future hotel.

11. Infrastructure building.
Ongoing excavating.